Fourth & Pike
Seattle, Washington
General Contractor
None
Mechanical Contractor
Emerald Aire
Highlights
Installed 800 amp, 208 volt power from sub-basement to 5th floor roof distribution panel, continue with 450 amps to the 10th floor roof distribution panel, provided equipment connections to eighteen (18) heat pumps, run line voltage to BCC controls on each floor, 120 volt circuit with interlock to supply fans, disconnect and reconnect forty-five (45) interior units and a complete shell fire alarm retrofit.