
This project consists of a 4000 Amp parallel service and two (2) 1250 kW generators with paralleling switchgear. Holmes provided and installed Category 6 and 6A network cabling, security system, sound masking and audio visual system. Data Center (40,000 sf) build-out and installation of 50 micron 10 gig backbone and copper cable connectivity. Responsible for new interbuilding and intrabuilding backbone copper and fiber optics. Redundant for both single-mode and multimode.