1101 Dexter Station
For this TI, there were two phases. The first phase updated floors 5-8 of this 10-story building including the three roof terrace decks on level 7 and two on level 9. Additionally, kitchens are on every floor with a large eat-in commercial kitchen on level 6. Together with phase 2, 1101 Dexter Station covered over 193,000 sf between 9 floors!
- 2 Phases
- Open Ceiling Construction
- Phase 1: 163,000 sf.
- Phase 2: 130,000 sf.
- 5 roof terraces and a 7,000 sf. roof deck
- 145 meeting rooms, 1000 open concept workstations, and space for another 750 people
- There is a large eat-in commercial kitchen, a 2,000 sf. kitchen along with kitchens on each floor
- General Contractor: Venture General Contracting
- Architect: Gehry Partners, LLP